ALS Fire Assay Evaporative Cooler Relocation & Replacement 

At A Glance

Key project details are below: 
  • Client: ALS Laboratories 
  • Location: 31 Denninup Way, Malaga, WA 
  • Services: Evaporative Cooler Replacement and Relocation, Ductwork, Commissioning Support 

We Delivered

Works completed on site included: 
  • Decommissioning and removal of a high-level wall-mounted evaporative cooler using an EWP and crane 
  • Supply and installation of a commercial Braemar RPS4000TC top-discharge evaporative cooler 
  • Fabrication of a custom uni-strut frame to support the new unit below the existing ductwork 
  • Supply and installation of new sheet metal ductwork connecting the cooler to the existing system 
  • Commissioning support to get the system running 

The Brief

The evaporative cooler serving the Fire Assay area had become unserviceable. ALS engaged us to replace it and relocate the new unit.

Project Overview

MAPS replaced and relocated the commercial evaporative cooler serving the Fire Assay area at ALS Laboratories’ Malaga site. We removed the old high-level wall-mounted unit, installed a new Braemar cooler on a custom frame below the existing ductwork, and connected it into the duct system serving the area. Electrical and plumbing disconnections were handled by other trades.

The Solution

Decommissioning and Removal 

We decommissioned the existing unit before it came off the wall, coordinating the timing with the trades handling disconnection. The lift couldn’t start until that was done. With the cooler mounted high on the wall, we used an EWP for access and brought in a crane to take the weight once it was freed from its mountings. Ryan, Callem and Dave managed the access and crane coordination, and stayed on through the mounting, ductwork and commissioning support. 

New Top-Discharge Cooler 

We supplied and installed a commercial Braemar RPS4000TC, a top-discharge model suited to the Fire Assay application. With the unit sitting under the duct run, the top discharge feeds up into the system above it. 

Custom Support Frame 

Relocating the cooler meant it needed new support, so we fabricated a custom uni-strut frame to hold the unit beneath the existing sheet metal ductwork. 

Ductwork and Commissioning 

We supplied and ran new sheet metal ductwork to connect the cooler into the existing duct system serving Fire Assay. Once it was in, we supported the commissioning to get the system running. 

Working Around a Live Laboratory 

ALS kept operating while we were on site, so the work had to fit around a working laboratory. Crane setup and access were planned around normal site activity. 

Outcome

The Fire Assay area now has a new commercial evaporative cooler running in place of the old wall-mounted unit. It sits on its own frame, set up so it can be serviced.

Client Feedback

ALS was pleased with how the project was handled, particularly the way the crane lift and site access were planned around a working laboratory. With the new cooler now running and set up for servicing, the Fire Assay team has a practical setup going forward.